Home Page

Search Winona Post:
   GO   x 
Advanced Search
     
  Issue Date:  
  Between  
  and  
     
  Author:  
   
     
  Column / Category:  
   
     
  Issue:  
  Current Issue  
  Past Issues  
  Both  
   Help      Close     GO   Clear   
     
  Sunday December 21st, 2014    

 Submit Your Event 
S M T W T F S


 

 

 
 

| PLACE CLASSIFIED AD | PLACE EMPLOYMENT AD |

| Home | Advertise with Us | Circulation | Contact Us | About Us | Send a Letter to the Editor |
 

  (ARCHIVES)Back to Current
Bridge lane restriction Friday (10/17/2012)
Motorists traveling on Highway 43 over the Mississippi River in Winona will encounter temporary lane closures and delays Friday, Oct. 19, as crews conduct survey work.

The equipment needed to conduct the survey requires a lane closure, and traffic will be reduced to a single lane controlled by flaggers from 9 a.m. 2 p.m.

The information gathered during the survey work will be used for the bridge rehabilitation and new bridge construction.

The Minnesota Department of Transportation urges motorists to always drive with caution, slow down in work zones and never enter a road blocked with barriers or cones.

 

 

   Copyright 2014, Winona Post, All Rights Reserved.

 

Send this article to a friend:
Your Email: *
Friend's Email: *
 Submit 
 Back Next Page >>

 

  | PLACE CLASSIFIED AD | PLACE EMPLOYMENT AD |

| Home | Advertise with Us | Circulation | Contact Us | About Us | Send a Letter to the Editor |
 

Contact Us to
Advertise in the
Winona Post!