Home Page

Search Winona Post:
   GO   x 
Advanced Search
     
  Issue Date:  
  Between  
  and  
     
  Author:  
   
     
  Column / Category:  
   
     
  Issue:  
  Current Issue  
  Past Issues  
  Both  
   Help      Close     GO   Clear   
     
  Thursday July 24th, 2014    

 Submit Your Event 
S M T W T F S


 

 

 
 

| PLACE CLASSIFIED AD | PLACE EMPLOYMENT AD |

| Home | Advertise with Us | Circulation | Contact Us | About Us | Send a Letter to the Editor |
 

  (ARCHIVES)Back to Current
Lane closures on Hwy. 43 bridge begin June 10 (06/09/2013)
Motorists traveling on Highway 43 over the Mississippi River in Winona will encounter temporary lane closures and delays beginning Monday, June 10, as crews conduct an annual bridge inspection.

The equipment needed to conduct the inspection requires a lane closure and traffic will be reduced to a single lane controlled by flaggers from 8 a.m. to 4 p.m. Both lanes will be open each evening after the inspectors have completed their work.

The lane closure will remain in effect through Thursday, June 13, weather permitting.

Routine inspections of this bridge and other Mississippi River bridges are conducted annually; an in-depth inspection takes place once every other year.

For statewide travel information, visit www.511mn.org, call 5-1-1 or log on to www.mndot.gov.

 

 

   Copyright 2014, Winona Post, All Rights Reserved.

 

Send this article to a friend:
Your Email: *
Friend's Email: *
 Submit 
 Back Next Page >>

 

  | PLACE CLASSIFIED AD | PLACE EMPLOYMENT AD |

| Home | Advertise with Us | Circulation | Contact Us | About Us | Send a Letter to the Editor |
 

Contact Us to
Advertise in the
Winona Post!