Home Page

Search Winona Post:
   GO   x 
Advanced Search
     
  Issue Date:  
  Between  
  and  
     
  Author:  
   
     
  Column / Category:  
   
     
  Issue:  
  Current Issue  
  Past Issues  
  Both  
   Help      Close     GO   Clear   
     
  Monday October 20th, 2014    

 Submit Your Event 
S M T W T F S


 

 

 
 

| PLACE CLASSIFIED AD | PLACE EMPLOYMENT AD |

| Home | Advertise with Us | Circulation | Contact Us | About Us | Send a Letter to the Editor |
 

I-90 traffic switch at Dresbach Bridge begins June 25 (06/26/2013)
Motorists will encounter new traffic patterns on Interstate 90 on the Wisconsin side of the Dresbach Bridge, beginning Tuesday, June 25, according to the Minnesota Department of Transportation.

Both directions of traffic were previously routed on one eastbound and one westbound lane. The new traffic pattern will route motorists on both westbound lanes.

The same traffic switch will occur on the Minnesota side of the Dresbach Bridge beginning Thursday, June 27, weather permitting.

This $187.5 million project is a cooperative effort between the Minnesota and Wisconsin Departments of Transportation and will continue through 2016. The project includes constructing a new I-90 crossing over the Mississippi River and reconstructing the Highway 61/14 and I-90 interchange.

The new I-90 river crossing will meet current structural and geometric standards, and the new interchange will improve traffic safety, capacity and access on and between Highway 61/14 and I-90.

For more information about the Dresbach Bridge project, or the Mississippi River Trail detour, visit www.mndot.gov/d6/projects/dresbachbridge.

 

 

   Copyright 2014, Winona Post, All Rights Reserved.

 

Send this article to a friend:
Your Email: *
Friend's Email: *
 Submit 
 Back Next Page >>

 

  | PLACE CLASSIFIED AD | PLACE EMPLOYMENT AD |

| Home | Advertise with Us | Circulation | Contact Us | About Us | Send a Letter to the Editor |
 

Contact Us to
Advertise in the
Winona Post!