Home Page

Search Winona Post:
   GO   x 
Advanced Search
     
  Issue Date:  
  Between  
  and  
     
  Author:  
   
     
  Column / Category:  
   
     
  Issue:  
  Current Issue  
  Past Issues  
  Both  
   Help      Close     GO   Clear   
     
  Saturday December 20th, 2014    

 Submit Your Event 
S M T W T F S


 

 

 
 

| PLACE CLASSIFIED AD | PLACE EMPLOYMENT AD |

| Home | Advertise with Us | Circulation | Contact Us | About Us | Send a Letter to the Editor |
 

  (ARCHIVES)Back to Current
Dresbach Bridge guardrail repairs postponed (01/17/2014)
Plans to repair the median guardrail on Dresbach Bridge on Interstate 90 are being postponed because of weather conditions, according to the Minnesota Department of Transportation.

Ames Construction, the contractor, is planning to reschedule the minor repairs possibly next week. The work will repair damage caused by a traffic crash on the bridge earlier this month.

Updates will be issued when a new repair date is selected. The repair work is expected to close the left lanes in both directions on the bridge over the Mississippi River while workers are making repairs.

The Minnesota Department of Transportation urges motorists to always drive with caution, slow down in work zones and never enter a road blocked with barriers or cones.

 

 

   Copyright 2014, Winona Post, All Rights Reserved.

 

Send this article to a friend:
Your Email: *
Friend's Email: *
 Submit 
 Back Next Page >>

 

  | PLACE CLASSIFIED AD | PLACE EMPLOYMENT AD |

| Home | Advertise with Us | Circulation | Contact Us | About Us | Send a Letter to the Editor |
 

Contact Us to
Advertise in the
Winona Post!